SREP

Spec sheet // Glossary // SREP
Glossary / S / SREP
Glossary · Regulatory reporting

SREP

SREPAlso called supervisory review and evaluation process, pillar 2 supervisory review

Definition

SREP, the supervisory review and evaluation process, is the regular assessment supervisors carry out of each bank's business model, governance, risks, capital and liquidity. It is the Pillar 2 counterpart to a bank's own ICAAP and ILAAP. The outcome is an overall score and firm-specific requirements, on top of the minimum rules.

SREP SCOREBUSINESS MODELGOVERNANCECAPITAL RISK
Fig. 1 · SREP
CRD Article 97 · EBA SREP guidelines · PRA SS31/15
Key rulesCRD Article 97 · EBA SREP guidelines · PRA SS31/15
Applies toEU credit institutions and relevant investment firms, through competent authorities
RegionsUK · EU
01

How it works

Supervisors review the bank's business model and its sustainability, its internal governance and controls, the risks to capital, such as credit, market, operational and interest rate risk, and the risks to liquidity and funding. They draw on regulatory reporting, the bank's ICAAP and ILAAP submissions, stress test results, on-site inspections and meetings with management. Each element gets a score, and the scores combine into an overall SREP assessment.

The outcome is a SREP decision or letter. It can set a Pillar 2 capital requirement on top of the Pillar 1 minimum, Pillar 2 guidance or a buffer, liquidity requirements and qualitative measures such as fixing control weaknesses or limiting certain activities. In the euro area the ECB runs the SREP for significant banks each year, applying EBA guidelines. In the UK the PRA carries out the equivalent review and sets Pillar 2A and the PRA buffer.

Step 1CategoriseSet the bank's supervisory category and review intensity.
Step 2Assess business modelJudge viability and sustainability of the bank's strategy.
Step 3Assess governanceReview board oversight, risk management and controls.
Step 4Assess capital and liquidityEvaluate risks and the adequacy of capital and liquidity.
Step 5Decide measuresSet Pillar 2 requirements, guidance and remedial actions.
02

The rules

EU · 1 January 2014CRD Article 97Directive 2013/36/EU (Capital Requirements Directive), Article 97, Supervisory review and evaluation

Requires competent authorities to review the arrangements, strategies, processes and mechanisms institutions use to comply with prudential rules and to evaluate the risks they are or might be exposed to.

EU credit institutions and relevant investment firms, through competent authorities
EU · 1 January 2023EBA SREP guidelinesEBA Guidelines on common procedures and methodologies for the supervisory review and evaluation process (SREP) and supervisory stress testing (EBA/GL/2022/03)

Set the common SREP methodology and scoring; revised guidelines published 26 June 2026 replace them, and the ICT risk guidelines EBA/GL/2017/05, from 1 January 2027.

EU competent authorities
UK · 29 July 2015, last updated 14 July 2026PRA SS31/15PRA Supervisory Statement SS31/15, The Internal Capital Adequacy Assessment Process (ICAAP) and the Supervisory Review and Evaluation Process (SREP)

Sets out how the PRA reviews the ICAAP in its SREP and uses it to set Pillar 2A capital and the PRA buffer; small domestic deposit takers move to SS4/25 from 1 January 2027.

PRA-regulated banks, building societies and designated investment firms
03

Common questions

How often does SREP happen?

For significant euro area banks the ECB runs it every year. Smaller banks may be assessed less often under a proportionate cycle set by their supervisor. In the UK, the PRA sets the frequency by the firm's category.

What is the difference between SREP and ICAAP?

The ICAAP is the bank's own assessment of the capital it needs for its risks. SREP is the supervisor's review of the bank, including that ICAAP. The supervisor can agree with the bank's figures or set higher requirements.

What is the SREP score?

Supervisors score each element and give an overall score, commonly on a scale from 1 (low risk) to 4 (high risk). The score drives the intensity of supervision and the level of Pillar 2 requirements.